traffic-signal construction plan · Danville, Virginia · fall 2026 expected start
Central Boulevard and Broad Street signal
Danville awarded a contract to replace the traffic signal at Central Boulevard and Broad Street, including poles, wiring, detection, cabinet, and controls. The city estimated a fall 2026 start.
Local record and application
What this record means for a receiving site
Danville awarded a contract to replace the traffic signal at Central Boulevard and Broad Street, including poles, wiring, detection, cabinet, and controls. The city estimated a fall 2026 start. An award and estimate are not proof that the junction is currently restricted; equipment dispatch needs the actual traffic-control phase. New poles, signal heads, detection, wiring, and control equipment can require changing lane arrangements at an intersection. The awarded contract provides scope, while only a fresh notice establishes today’s traffic pattern. Check both intersection approaches and turning movements when the work-zone plan is published. The Central Boulevard and Broad Street signal contract identifies a changing intersection, not a kitchen shutdown. For a separate worksite meal operation, Danville kitchen trailer rental should be located where its truck can make legal turns under the active signal plan. Estimate covers and cooking methods first, then confirm power or fuel, potable water, grease and wastewater handling, fire access, and the property owner’s approval.

Equipment application
Plan from the facility's actual workload
What meal volume, menu, staff flow, cooking power, potable water, and wastewater capacity will the receiving site require?
Compare mobile kitchen trailers. Send the exact site address, approved gate, dates, utilities, and receiving contact so availability and fit can be checked.
This public event or project does not imply that Rolling Kitchens supplied equipment to a named organization or that a trailer is required now.
Published equipment reference
Check the supplied price sheet
24 ft mobile kitchen, Tier 1 lists $5,995–$7,995 in the owner's 1–6 day column. The sheet does not define a billing unit or include a Danville delivery charge, setup, permits, taxes, or live availability. Request a written delivered price.
View detailed equipment pricing- Receiving addressRequired for a quote
- Delivery and utility fitConfirm with provider
