shared-use path design · Salem, Virginia · Design phase; construction anticipated 2027–2028
Elizabeth Campus Greenway Phase 2
Salem’s engineering project list places Elizabeth Campus Greenway Phase 2 in design. It would link the Elizabeth Campus to Salem Stadium with a shared-use path at an estimated total cost of $1.3 million, with construction anticipated in 2027–2028.
Local record and application
What this record means for a receiving site
Salem lists Elizabeth Campus Greenway Phase 2 as a design-stage project, not a completed path. The planned shared-use connection would run from Roanoke College’s Elizabeth Campus toward Salem Stadium. The engineering page gives an estimated $1.3 million total cost and anticipates construction in 2027–2028. That schedule leaves time for a stadium or campus food operator to plan around eventual path work, but it does not establish a present closure. For a separately approved event requiring Salem kitchen trailer rental near these venues, identify the actual parcel, service entrance, and permitted trailer footprint. A future shared-use route should stay clear for walkers and cyclists; cooking queues, exhaust, cables, and wastewater hoses belong within the organizer’s controlled area. Confirm water, sanitary disposal, power or fuel, and fire access before committing to a kitchen size. If the greenway project enters construction, use the latest city or contractor notice to revise deliveries. The city project list supports the proposed connection and funding estimate, not a foodservice contract or a specific construction detour today.

Equipment application
Plan from the facility's actual workload
What meal volume, menu, staff flow, cooking power, potable water, and wastewater capacity will the receiving site require?
Compare mobile kitchen trailers. Send the exact site address, approved gate, dates, utilities, and receiving contact so availability and fit can be checked.
This public event or project does not imply that Rolling Kitchens supplied equipment to a named organization or that a trailer is required now.
Published equipment reference
Check the supplied price sheet
24 ft mobile kitchen, Tier 1 lists $5,995–$7,995 in the owner's 1–6 day column. The sheet does not define a billing unit or include a Salem delivery charge, setup, permits, taxes, or live availability. Request a written delivered price.
View detailed equipment pricing- Receiving addressRequired for a quote
- Delivery and utility fitConfirm with provider
