water and sewer infrastructure plan · Winchester, Virginia · 2026 procurement phase
Jefferson Street water-main replacement
Winchester plans to replace aging water lines along Valley Avenue and Jefferson Street, improve service connections, add sewer connections for the high school, and build a north-side Jefferson Street sidewalk. The city lists design complete and procurement in process.
Local record and application
What this record means for a receiving site
Winchester’s Jefferson Street Water Main Replacement page locates the work along Valley Avenue and Jefferson Street, with a reference address of 700 Jefferson Street. The scope calls for larger water mains, upgraded service connections, new sewer connections for the high school, and a sidewalk along the north side of Jefferson Street. The city marks design complete and bid, procurement, and award in process; construction is still listed as upcoming on that project page. That distinction matters because a planned utility project is not a present shutoff notice. If a school or nearby institution later documents a food-production interruption, Winchester kitchen trailer rental should be sized around the actual menu, meals per shift, potable-water demand, wastewater path, and receiving gate. Utility staff must confirm which meter and service line are affected, when any interruption begins, and whether a safe temporary connection is possible. Drivers should verify current lane controls and school arrival periods. The public plan does not establish a current cafeteria closure.

Equipment application
Plan from the facility's actual workload
What meal volume, menu, staff flow, cooking power, potable water, and wastewater capacity will the receiving site require?
Compare mobile kitchen trailers. Send the exact site address, approved gate, dates, utilities, and receiving contact so availability and fit can be checked.
This public event or project does not imply that Rolling Kitchens supplied equipment to a named organization or that a trailer is required now.
Published equipment reference
Check the supplied price sheet
24 ft mobile kitchen, Tier 1 lists $5,995–$7,995 in the owner's 1–6 day column. The sheet does not define a billing unit or include a Winchester delivery charge, setup, permits, taxes, or live availability. Request a written delivered price.
View detailed equipment pricing- Receiving addressRequired for a quote
- Delivery and utility fitConfirm with provider
