Protect patient meal requirements and separate clean production from dirty returns and construction access.
First decision
Where will trays be assembled and transferred without crossing dirty returns or restricted clinical routes?
From the original planning modules
What changes in this application
06 · Onsite kitchen trailer for hospital continuity
Count patient, staff, and visitor meals separately. Document therapeutic diets, allergen control, tray assembly, dirty returns, secure receiving, and access for dietary staff. A hospital must confirm infection-control, facilities, and health approvals for its specific temporary plan.
Site sequence
Work through the handoffs.
01
Protect the menu
List diet categories and meal deadlines. Compare the temporary cooking and holding plan with the hospital’s own dietary procedures.
02
Separate flows
Show deliveries, staff entry, clean food movement, soiled tray return, and waste collection on a site drawing.
03
Approve the cutover
Facilities, food service, safety, and infection-control leads should agree on utilities, inspections, staffing, and backup meals.